1.Before starting the plastic hollow blow molding machine, it is necessary to add lubricating oil to each moving component once. Check if each moving component is sturdy,Are there any loose or scattered screws, especially in the center with strong impact force, and can the belt transmission be normal in some parts.
3.The staff needs to check if the lamp tube is damaged or broken. It needs to be replaced in a timely manner. Check if there is any air leakage in each pneumatic component and if the action is flexible. Check for any abnormal air leakage in the triad,When the electromagnetic valve of the plastic hollow film blowing machine encounters abnormalities, it should be cleaned in a timely manner.
4.Arm swing can be added once every three to four days. The large and small chains of the heating machine can be used once a month. Regularly check if the main engine reducer and heater reducer are out of oil. The main engine bearings can be added once every two to three months.
5.Check if the high-pressure gas source, low-pressure gas source, power supply, and water source are functioning properly. Check if all emergency stop switches, safety door switches, and maintenance installation inspection switches are functioning properly.
6.Check if the heating head enters the embryo and if the dropped part works properly. If the insertion is not in place, adjust the pressure and install the nut.The above six points are detailed components for inspection. The service life of the machine depends not only on the quality of the machinery itself, but also on the skills and techniques of the workers.
Support order samples, customization, wholesale direct, and complete payment.
If the product you look for does not have corresponding customized content, pls fill out the
form below to contact us, and we will reply ASAP.